Wind Energy

Ocotillo Wind – Pattern Energy 7/20/2018 Running at around 20% capacity factor

This facility was touted as delivering 265 megawatts of power which requires wind speeds in the neighborhood of 25 mph, the facility is only running at around 20% capacity factor. They claimed that it would be running at a 34% capacity factor, they missed the mark big time.

About the author

Ahead of it All

Add Comment

Click here to post a comment

Search

Recent Posts